What is the Highway Division?

The MassDOT Highway Division designs, constructs, maintains, and operates the state’s highways, bridges, and tunnels. The division also assists cities and towns with their road and bridge needs to help ensure that all people can travel safely and efficiently throughout the state.

The ability for residents and visitors to reach their destinations is key to the Commonwealth’s quality of life, economy, and environment. To enable the millions of daily trips within Massachusetts, the Highway Division seeks to support a sustainable roadway network that is safe for walking, biking, micro mobility, transit, and driving. The Highway Division’s 2,350 employees plan, design and construct infrastructure projects and operate and maintain the existing network.

The Highway Division divides the state into six districts to manage the 9,599 roadway miles owned by MassDOT, which includes all interstates and limited-access freeways. Approximately one-half of MassDOT roads are non-freeway. The Division is responsible for over 5,000 bridges, of which it owns 3,498. In addition to stewardship of state infrastructure, MassDOT oversees the design and construction of federally funded municipal projects.

 

Highway District Map

Scorecard



Performance Goal Performance Measure Current Performance (CY22) CY21 2024 Target 2026 Target Long Term Target
Safety Fatalities in Roadway Work Zones (Five-Year Rolling Average) 5.4 5.4 towards zero towards zero 0
Number of Bicycle Fatalities (Five-Year Rolling Average) 6.6 7.2 towards zero towards zero 0
Number of Fatalities (Actual) 439 415 towards zero towards zero 0
Number of Fatalities (Five-Year Rolling Average) 378 359 377 362 0
Number of Motorcycle Fatalities (Five-Year Rolling Average) 60 58 towards zero towards zero 0
Number of Non-Motorist Serious Injuries and Fatalities (Five-Year Rolling Average) 480 468 445 435 0
Number of Pedestrian Fatalities (Five-Year Rolling Average) 76 70 towards zero towards zero 0
Number of Serious Injuries (Five-Year Rolling Average) 2,708 2,625 2,708 2,603 0
Rate of Fatalities per 100 Million VMT (Five-Year Rolling Average) 0.62 0.59 0.61 0.54 0
Rate of Serious Injuries per 100 Million VMT (Five-Year Rolling Average) 4.42 4.3 4.36 3.91 0




Performance Goal Performance Measure Current Performance (CY21) CY20
Customer Experience Average Commute Time (5-Year ACS Estimate) 29.6 30
Percentage of workers aged 16 and over who commute by bicycle 1% 1%
Percentage of workers aged 16 and over who commute by carpool 7% 7%
Percentage of workers aged 16 and over who commute by driving alone 66% 68%
Percentage of workers aged 16 and over who commute by public transportation 8% 10%
Percentage of workers aged 16 and over who commute by taxicab, motorcycle, or other means 1% 1%
Percentage of workers aged 16 and over who commute by walking 5% 5%
Percentage of workers aged 16 and over who work from home 12% 8%



Performance Goal Performance Measure Current Performance (FY23) FY22 2024 Target 2026 Target Long Term Target
Budget & Capital Expenditures Number of Construction Contracts Completed in Year 128 111 Context Only
Number of Contracts in Construction Phase 542 341
Number of Contracts Planned for Next Year 71 83
Percent of Contracts Completed On or Under Budget 74% 79% 80% 80% 80%
Percent of Contracts Completed On Time 63% 70% 75% 75% 75%
Percent of STIP Projects Advertised in Year 93% (FFY23) 85% 90% 90% 95%
System Condition Failed or Missing Curb Ramps 3432 3,605 3,250 3,000 0
Pavement Repair Backlog (Lane Miles) 2,284 (FFY22) 2,208 Context Only
Percent of Deck Area in Good Condition (NHS only) 16% 17% 16% 16% 16%
PSI – Interstate (Percent in Good and Excellent Condition) 87% (FFY22) 91% 88% 88% 95%
PSI – Interstate (Percent in Poor Condition) 2% (FFY22) 1% 3% 3% 1%
PSI – Non-Interstate (Percent in Good and Excellent Condition) 71% (FFY22) 70% 70% 70% 75%
PSI – Non-Interstate (Percent in Poor Condition) 9.7% (FFY22) 10% 10% 10% 5%
Statewide Bridge Condition (Percent of Poor Bridges) 9% 8% 10% 10% 8%
Structurally Deficient Deck Area (NHS only) 12% 12% 12% 11% 8%



Performance Goal Performance Measure Current Performance (FY23) FY22 2024 Target 2026 Target Long Term Target
Healthy & Sustainable Transportation CO2 Reduction From Solar Energy Generated (Tons) 2,220 2,335 Context Only
GHG Avoided Through Electric Charging Station Sessions (Metric Tons)

165 96.2
Number of Complete Streets Policies Approved

257 256 300 315 351
Number of Electric Charging Station Sessions

12,511 13,020 Context Only
Number of Municipalities Registered for Complete Streets

289 282 305 325 351